- +971 547 2020 14
- [email protected]
- 9th Street, M-15, Abu Dhabi, UAE
Menu
An overview of the completed piling and shoring projects
Execution of bored pile foundation works, including the construction of
Preliminary Test Piles (PTP) and the performance of static pile load tests prior to
commencement of main piling works, for the Potable & Fire Water Pump Station and
Recycled Water Pump Station,
Installation of a Bored cast-in-situ using temporary (internally) 900 mm Dia Piles and
permanent(externally) 1100mm Casing for debonding piling works. 60 Nos
Executed the design and construction of bored piling works for a proposed second biggest mosque project located in Ain Al Fayda, Al Ain, UAE.
Installation of a soldier pile retaining wall along the shoring length, as per the drawings. Works include pre-drilling to break the hard layer, driving steel I beams at 1.5m c/c spacing and excavation depth is 5 m BEGL.
Execution of secant pile Wall
Installation of guide wall for each shaft. Drilling piles using a bored pile rig to the designed depth for each pile casting the drilled piles
Execution of 650 piles with 250mm Dia using the Micro piling technique
Drilling of 157 board piles 800mm dia, 6000mm length, fabrication and installation of steel cage supplied by the main contractor, pouring concrete from -5.0 to -13m (2.0m above the Cut-Off level).
Execution of a total of 240 CFA piles were constructed with a 500 mm & 600 mm diameter and depths up to 12 meters, Allow for shoring system installation; 12m deep UB 457x191x67 kg/m at 1.5m spacing
Drilling of bored piles with varying diameters and depths, tailored to each site’s requirements
Execution of cast in situ bored piles using casing method for the project. The piling work includes drilling, casing, reinforcement cage installation, and concreting.
SAEC Foundations was engaged on this project to provide CFA foundation services, including the design, installation, and testing of CFA piles.