SAEC – Bored Piling for Lighting Poles – Abu Dhabi
Bored Piling

Bored Piling for Lighting Poles – Abu Dhabi

Client

HILALCO

Location

Saadiyat Island, Abu Dhabi, UAE

Completed

Jan 2025

Project Overview

Key project information

Client

HILALCO

Location

Saadiyat Island, Abu Dhabi, UAE

Category

Bored Piling

Completion Date

January 11, 2025

Project Details

Complete project information

Project Overview

SAEC executed cast-in-situ bored piles for lighting poles on a coastal development in Saadiyat Island, Abu Dhabi for HILALCO.

Scope of Work

  • Drilling of cast-in-situ bored piles
  • Installation of temporary casing
  • Installation of reinforcement cages
  • Concreting of piles

Value Delivered

Piled foundations give lighting poles long-term stability against wind loads in coastal ground conditions.

Engineering Context

Coastal ground often has loose sand and a shallow water table, which can make open bores unstable. Temporary casing keeps each hole open until the cage is placed and concrete fills the bore from the base.

Related Work and Reading

Related projects: Bored Piling for Road Poles – Abu Dhabi and HV Transmission Line Piling – Abu Dhabi. Further reading: Bored Piles for Bridge Foundations in the UAE. Send us your drawings and soil report for a foundation proposal.

SAEC is a specialist bored piling contractor in Abu Dhabi, serving projects across the UAE.