Bored Piling for Tower Foundations at an Oil Field – Abu Dhabi
DESCON
Al Dhafra Region, Abu Dhabi, UAE
Jul 2026
Project Overview
Key project information
Client
DESCON
Location
Al Dhafra Region, Abu Dhabi, UAE
Category
Bored Piling
Completion Date
July 9, 2026
Project Details
Complete project information
Project Overview
SAEC was appointed by DESCON to execute bored cast-in-situ piles for tower foundations inside an operating oil field in the Al Dhafra Region of Abu Dhabi.
Scope of Work
- Installation of 200 bored piles, 800 mm in diameter and 5 m to 10 m deep
- Four piles per tower foundation, drilled to design depth with temporary casing
- Installation of prefabricated reinforcement cages and concrete placement
- Work inside a security-controlled facility under strict permit and HSE requirements
Value Delivered
Short, large-diameter bored piles delivered stable tower foundations quickly, with execution planned around the access and safety rules of a live oil and gas site.
Engineering Context
Inside an operating oil field, permits, security access and buried services shape the programme as much as the drilling itself. Short, large-diameter bored piles in groups of four give each tower a stable base against overturning and uplift.
Related Work and Reading
Related projects: Bored Piling for Rail Infrastructure – Abu Dhabi and Bored Piling for Pedestrian Bridges – Al Ain. Further reading: Piling Inside Oil and Gas Facilities in Abu Dhabi: Permits, Safety and Planning. Send us your drawings and soil report for a foundation proposal.
SAEC is a specialist bored piling contractor in Abu Dhabi, serving projects across the UAE.
Back to Project Gallery
Discover more of our exceptional projects