
CFA Piling for Boundary Walls – Abu Dhabi
HILALCO
Abu Dhabi, UAE
Apr 2022
Project Overview
Key project information
Client
HILALCO
Location
Abu Dhabi, UAE
Category
CFA Piling
Completion Date
April 28, 2022
Project Details
Complete project information
Project Overview
SAEC installed Continuous Flight Auger (CFA) piles to support the boundary walls of a development in Abu Dhabi for HILALCO.
Scope of Work
- Installation of 500 mm diameter CFA piles
- Pile foundations for the boundary wall structures
Value Delivered
CFA piles provide fast, low-vibration installation and a stable foundation for long runs of boundary wall.
Engineering Context
Long boundary walls cross changing ground, so differential settlement can crack panels and joints. Regularly spaced CFA piles give the wall a consistent foundation along its full length.
Related Work and Reading
Related projects: CFA Piling for a Public Facility – Abu Dhabi and CFA Piling for a School – Abu Dhabi. Further reading: CFA Piling in Abu Dhabi: Planning a Fast, Fully Tested Foundation Programme. Send us your drawings and soil report for a foundation proposal.
SAEC is a specialist CFA piling contractor in Abu Dhabi, serving projects across the UAE.
Back to Project Gallery
Discover more of our exceptional projects