SAC was engaged to investigate significant water leakage in the basements of the Diamond Tower.

The basements showed concrete deficiencies, including peeling paint, corroded steel, and spalling surfaces due to water seepage. The investigation aimed to assess the condition of the concrete and determine the root causes of these defects.