Shoring Works
Shoring System Design - CEIL Tower Project
Client
THE FIRST GROUP
Location
DUBAI
Completed
Nov 2024
Project Overview
Key project information
Client
THE FIRST GROUP
Location
DUBAI
Category
Shoring Works
Completion Date
November 2, 2024
Project Details
Complete project information
SAC was appointed by TFG to conduct a geotechnical study and provide a design solution for demolishing an unused manhole which obstructing the proposed shoring system for the Ciel Tower project which support excavation works ranging from 1.5 to 3 meters in depth, which located adjacent to the RTA bridge ramp in the Dubai - Marina area.