Once a pile is cast it cannot be seen, so testing is the only way to show that it will carry its design load and has no defects. Most specifications in the UAE ask for a mix of load tests and integrity tests. This is what each test does and when it is used.

Static load tests

A static load test applies load to a pile in stages and measures how much it settles. It is the most direct check of capacity and is covered by ASTM D1143. Two kinds of pile are tested:

  • preliminary (non-working) piles, installed before the main works and loaded higher to confirm the design
  • working piles, usually about 1 to 2% of the total, loaded to a proof load above the working load

The jack needs something to push against. The common reaction systems are:

  • kentledge: a platform stacked with concrete blocks heavier than the test load
  • reaction piles or ground anchors: the jack pushes against a steel beam tied down to them
  • bi-directional (O-cell): a hydraulic jack cast inside the pile loads the shaft and base against each other (ASTM D8169)

A static test usually takes several days once setup, loading and removal are included.

Dynamic load tests

In a dynamic test (PDA, ASTM D4945), a heavy drop weight strikes the pile head while sensors record force and velocity, and the results are analysed to estimate capacity. Dynamic tests are quicker and cheaper than static tests, so more piles can be checked, but they are normally calibrated against at least one static test.

Integrity tests

Integrity tests do not measure capacity. They check that the pile is continuous and free of necking, voids or soil inclusions.

  • low-strain pile integrity test (PIT, ASTM D5882): a small hammer tap on the pile head, used on every pile on most projects
  • cross-hole sonic logging (CSL, ASTM D6760): ultrasonic pulses sent between steel tubes cast into the pile, used on large-diameter bored piles
  • thermal integrity profiling (TIP, ASTM D7949): sensors on the cage record the heat of the curing concrete to show the pile’s shape

What a typical specification asks for

On our recent projects, testing scopes have included static load tests on 2% of working piles and integrity tests on every pile. For large bored piles on bridges, every pile was tested with CSL, and static tests were run on working and non-working piles with loads up to 280 tonnes. Concrete cubes are tested for every pour.

Plan testing before piling starts

Related projects: Bored Piling for Pedestrian Bridges – Al Ain, Bored Piling for Rail Infrastructure – Abu Dhabi and Micropile Design & Load Testing for Port Facilities – Abu Dhabi.

Test piles, reaction systems and access tubes all have to be planned in advance. CSL tubes must be fixed to the cages before they are lowered, and static tests need space and time close to the rigs. SAEC carries out static, dynamic and integrity testing on its piling projects. See our pile load testing and integrity services.

Share this article

If you found this article helpful, share it with others

Related Posts