SAEC team aligning a steel sheet pile after predrilling through rock in Abu Dhabi
Shoring & Sheet Piling

Predrilling & Sheet Piling Through Sandstone – Abu Dhabi

Client

Agility

Location

Al Jurf, Abu Dhabi, UAE

Completed

Aug 2023

Project Overview

Key project information

Client

Agility

Location

Al Jurf, Abu Dhabi, UAE

Category

Shoring & Sheet Piling

Completion Date

August 6, 2023

Project Details

Complete project information

Project Overview

SAEC delivered a sheet pile shoring system in Al Jurf, Abu Dhabi for Agility, overcoming an 8 m sandstone layer that prevented conventional driving.

Scope of Work

  • Predrilling with a bored pile rig to enable sheet pile driving through the sandstone
  • Installation of AU20 steel sheet piles
  • Bracing system using HEA 220–300 steel beams
  • Extraction of sheet piles on completion of the works

Value Delivered

Predrilling solved a difficult ground condition, and recovering the sheet piles after use kept the temporary works efficient and cost-effective.

Engineering Context

Sheet piles cannot be driven through strong sandstone without damage or refusal. Predrilling along the wall line opens a path for the sheets, and recovering them afterwards keeps temporary works economical.

Related Work and Reading

Related projects: Shoring System Design for a High-Rise Tower – Dubai and Shoring & Retaining Wall – Veterinary Hospital, Al Ain. Further reading: Sheet Piling Through Rock: Why Predrilling Makes the Difference. Send us your drawings and soil report for a foundation proposal.

SAEC is a specialist shoring and sheet piling contractor in Abu Dhabi, serving projects across the UAE.

Back to Project Gallery

Discover more of our exceptional projects